Cannon Air Force Base Medical Clinic

New Mexico, NM
Share
share

Client

United States Air Force

Project Team

Orlando Ballate, P.E.
VP Samy, P.E.


Services

  • Condition Assessment
  • Structural Design – New Construction
  • Structural Design – Restoration

The project consisted of replacing existing curtain wall system with a new blast-resistant curtain wall system and renovating all exterior precast concrete façade elements. The project was performed as a Design-Build Project by Weather Proofing Technologies, Inc. (WTI) of Cleveland, Ohio, and O&S Associates. O&S and WTI performed the field inspections and prepared a detailed cost proposal and scope work. O&S prepared construction drawings and specifications for the selected scope of work.

Work consisted of the following:

Construction Data:

Cost: $1,450,000

Completion Date: November 2004

Special Features:

Replacing a 25-year-old curtain wall with a blast resistant curtain wall system

Owner:

United States Air Force

Cannon, New Mexico