Hudson River Park Segment 5
New York, NY
Owner/ Client:
Hudson River Park Trust
Maitra Services Used:
Stormwater Management
Civil Engineering
Sewer Improvements
Electrical Engineering
The landmark project along the Hudson River consists of three major components, including Bulkhead and platform structure repair and replacement, subsurface pier structure repair and replacement, and Upland Park pier improvements. The Upland Park extends from Horatio Street in the south to 25th Street in the north, between the Route 9A bikeway and the bulkhead.
Maitra provided civil/site and electrical engineering and design, including grading and drainage design elements, coordination with DEP, demolition plans for utilities, construction documents for roadways, gates, walkways, utility, sanitary, and storm sewer improvements. Electrical design included power distribution system and underground duct banks for lighting, the Marina, Events area, Carousel building, and irrigation equipment.
Services were performed by Maitra Associates, PC; an affiliate of O&S Associates, Inc.